High pure Tellurium metal 3N-7N 99.999% Factory price CAS:13494-80-9
Application
1. Tellurium can be uned in semiconductor devices, alloys, chemical raw materials and cast iron, rubber, glass and other industries as additives;
2. Tellurium powder can be also used in prepare tellurium compounds and to be used as semiconductor research materials.
3. Tellurium is also the raw materials of solar cells and It can be used as colorant of ceramics and glass, vulcanizing agent of rubber, catalyst of petroleum cracking, etc. it is also used to prepare decane and alloy. It is a promising semiconductor material for the preparation of tellurium compounds and also as catalyst.
Basic information
Tellurium is a chemical substance with the molecular formula of Te. It is gray powder with high toxicity. The melting point is 452 ℃ and the boiling point is 1390 ℃. It can be used as catalyst, curing agent,semiconductor, colorant, etc.
- Standard: ISO9001: 2018Alloy Or Not: Non-AlloySecondary Or Not: Non-secondaryPlace of Origin: ChinaAvailable purity: 99.9% 99.99% 99.999% 99.9999% 99.99999%Te (Min): 3NBrand Name: Juchun
- Appearance: silverMolecular Weight: 127.6CAS NO.: 13494-80-9EINECS NO.: 236-813-4Melting point: 452 °CBoiling point: 988 ºCDensity: 6.25 g /cm3
product parameter
Product Name |
CAS No. |
Purity |
Specification |
Tellurium powder (Te) |
7782-49-2 |
3N-6N |
100-600mesh |
Tellurium shot (Te) |
7782-49-2 |
3N-6N |
0.2-6mm |
Tellurium lump (Te) |
7782-49-2 |
3N-7N |
irregular lump |
Tellurium ingot (Te) |
7782-49-2 |
3N-7N |
product display
Advantage
Quality First
Competitive Price
First-class Production Line
Factory Origin
Customized Services
faqs
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock, or it is 15-20 days if goods needs preparation it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=10000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipment.















